*I got the mat from Buck Terrell athletics.
*The standards are a 1980 model by pacer, i sanded the rust off and painted them and re did the tracks and wheels, and the pipes.
*I built the runway with lumber its 40" wide and 90 feet long. (no track rubber yet.)
*The sign came compliments to the bar next to the dealership im working at...
....this project was built with the intensions of not being easy and it wasnt... not to cheap either but its worth it to me.. why not? i have some more pictures i will post, not done yet.
